APPLY POLAND multidiscipline taskforce executes projects within the following technical disiplines:
The CO2 levels in the Åsgard B export gas is increasing and additional CO2 removal will be needed to achieve export specification to the onshore treatment plant at Kårstø. The export gas is also generally limited by the CO2 content. Mixing of Smørbukk gas and Midgard gas is necessary to achieve the export gas specification to the Åsgard Transport pipeline of 2.0 to 2.3 mol% maximum CO2. Project is executed by APPLY Sorco.
The Auk platform, located approximately 155 miles south east of Aberdeen, is a fixed platform on which there are facilities for drilling, production, accommodation and the associated utilities. The AUK project is executed by APPLY Sorco, in project socpe is modification of existing AUK platform, installing new drilling rigs, including drilling support and utility modules.
Modification and Maintenance project in connection with the operation of the Alvheim FPSO is executed by APPLY Sorco.
KEP2010 is an umbrella project executed by APPLY Sorco comprising larger upgrading and modification projects at Kårstø in the period from 2006 to 2010.
The main objectives for KEP2010 is increased capacity, improved flexibility and regularity on equipment and control systems.
Design of HDS installation LOTOS Gdańsk as a subcontractor for ABB, CB&I Lummus and Lurgi. The HDS unit allowes to increase in Grupa LOTOS ultra-low diesel production to approximately 2.3 million metric tons per annum (MTA) directly after the date of start-up and more, when the new crude distillation will be added to the project. The unit allow Grupa Lotos to comply with the EU requirement of less than 10 ppm sulphur in the diesel oil, which is in force as of 2009.
Living Quarter (LQ) module with Helideck were designed and built for Chevron Nigeria Ltd. in Norway by Apply Leirvik for the Delta Field. LQ module were redesigned in order to fulfill the actual norms and standards requirements for the Delta South LQ Platform in Nigeria