AKCS VOC Recovery Unit project was executed for Statoil Mongstad by Promecon Denmark.
The Gjøa field is located approximately 60 km north-east of the Troll C platform in blocks 35/9 and 36/7. The field lies in water depths ranging from 360 – 380 m.
The Troll fields lie approximately 65 km off Kollsnes near Bergen and comprise two main structures. The new LQE facilities consists of three modules, are located on the south, (LQES), east, (LQEE), and north, (LQEN), sides of the existing LQ. The new facilities are contain 150 single cabins, new CCR, new kitchen area, lay-down deck, recreation rooms, coffee bars, offices for the project, operations and contractors, as well as other required rooms and areas.
Design of HDS installation LOTOS Gdańsk as a subcontractor for ABB, CB&I Lummus and Lurgi. The HDS unit allowes to increase in Grupa LOTOS ultra-low diesel production to approximately 2.3 million metric tons per annum (MTA) directly after the date of start-up and more, when the new crude distillation will be added to the project. The unit allow Grupa Lotos to comply with the EU requirement of less than 10 ppm sulphur in the diesel oil, which is in force as of 2009.